Skip to content

Conference

Stamping

S010: Maximizing Progressive Die Performance During Production

  • Date

  • Time

  • Experience Level

    Basic

  • Location

    N211 N212

Overview

Maximizing Progressive Die Performance During Production

9:00 am – 10:30 am Basic

Many progressive dies do not run at optimum production speeds. Many factors influence the performance of progressive dies including die setup procedures, feed settings, straightener settings, dynamic shut height variances, and press condition. This presentation examines the major factors influencing progressive die performance and part quality, including a focus on feed angles and establishing proper pilot release timing.

About the Speaker

  • Peter Ulintz

    Pace Technologies, LLC

    Biography

    Peter has over 45+ years of experience working with the metal forming companies and toll & die shops, including 9 years with PMA as technical director. He currently servies as an independent PMA technical consultant. He established Pace Technologies, LLC in 2008 as a technical training and consulting company to serve the tool & die and metal stamping industries. He also writes the monthly column “Tooling By Design” for MetalForming Magazine (230+ articles since 2006),

    More Details about Peter

Pricing & Registration

Early-Bird Pricing
Through September 11

Price
Individual Sessions $220 $175
Workshops $600 $480
Full Conference (5-10 Sessions) $900 $720

Price
1 Session $125
2 Sessions $225
3 Sessions $300
4-8 Sessions $450

Early-Bird Pricing
Through September 11

Price
Weld-Ed Conference $75 $50
One-Hour Sessions FREE
90-Minute Sessions $200 $150
Half-Day Sessions $550 $450
Full-Day Sessions $600 $500
Professional Program $425 $325

Popular Searches

Search results for ''

Page